Replace Flush Pipes In Settling Basin – 10” Tee & 900 Bend , 6” Spools On Raw Water Line | Yara Trinidad Limited | 2010 |
Structural Steel Framing Works As Per B.O.Q. – Blocks D And Block L – Arouca | Beijing Liujian Construction Co-Operation T &T | 2010 |
Construction Of Proposed Raw Water Sump A-868 And Related Infrastructure At M3 / M4 Plant | Industrial Plant Services Limited | 2010 |
Structural Steel Framing Works As Per B.O.Q – Covered Walkway Aranguez Junior Secondary School | Beijing Liujian Construction Co-Operation T &T | 2010 |
Construction Of Two (2) Skids For 915 Compressor | Neal And Massey Energy | 2010 |
Csp / Sat Bldg # 7 Excavate And Expose Cable | Petroleum Company Of Trinidad & Tobago | 2010 |
Repairs Sulphur Hopper Drilling Plant | Petroleum Company Of Trinidad & Tobago | 2010 |
Construction Of 58ft Shed | Lonestat Construction Limited | 2010 |